What we hold, what condition it is in, and how to get a copy.

We are a small organisation and this is a small dataset. It is offered honestly rather than dressed up as a data portal.

What we hold

DatasetCoversFormatHow to get it
Quarterly water quality readings6 points, 2023 to presentCSVOn request
Planting records and survival countsAll sites, 2022 to presentCSVOn request
Fixed-point bank photography6 points, quarterlyJPEG with coordinatesOn request
Buffer agreements registerAnonymisedCSVOn request, anonymised only
Site boundary sketchesActive sitesGeoJSONOn request

Why nothing downloads directly yet

Two reasons. Some records contain landowner information that needs removing properly rather than hastily, and we would like to know who is using the data so we can tell them when it is corrected. Direct download is planned once the anonymisation is done to a standard we are comfortable with.

What the data looks like before you ask for it

Each chart below has a table view and a CSV download built into it, so nothing here requires reading a figure off a picture. These are the same series we publish across the site rather than a summary prepared for this page.

The turbidity record is the one worth studying first, because it contains the result we like least: the point below Mbarara read higher last dry season than the year before, despite the work upstream.

Turbidity at our monitoring points

Nephelometric turbidity units — how much soil is suspended in the water. Lower is better. RW-04 sits downstream of our earliest buffer planting; RW-05 is a stretch we deliberately never restored, so it shows what would have happened anyway.

Show:

The control site is drawn as a dashed line, so it is distinguishable without relying on colour.

Two of six points got worse last dry season. RW-02 and RW-03 sit below the city's discharge, which buffer planting cannot influence. We publish them rather than showing only the sites that flatter us.Source: Own quarterly sampling, 2023 to 2026-06-30. Sample data pending upload of the real field records.

Seedling survival at twelve months, by planting cohort

The number that decides whether a planting day meant anything. We publish it beside the planting total, always — quoting one without the other overstates the work by roughly 60%.

65% or betterBelow 65%Total loss
The dashed line is the twelve-month average across completed cohorts, 61%. The 2023 dry-season cohort is a total loss: 900 seedlings at Nyakayojo, planted after agreeing with the landowner but without speaking to the household actually farming the land. It stays on the chart. The newest cohort is a six-month count and is excluded from the average until its year is up.Source: Own field counts on sample transects, 2022 to 2026-06-30. Sample data.

Bank replanted and surviving

Cumulative kilometres with buffer planting still alive at twelve months. Not the length we planted — the length that held.

Source: Own field records, 2022 to 2026-06-30. Sample data.

Read the control before the results

RW-05 is a stretch we have deliberately never restored and never will. Without it, an improvement at a planted site could just as easily be a wetter year. Any comparison drawn from these series that ignores the control is a comparison we would not stand behind ourselves.

The catchment as spatial data

The map below is built from 43,776 NASA SRTM 30 m elevation samples and the coordinates of our own sites. The terrain, the contours and the long profile all derive from that same grid, and the source is public domain — you do not need our permission to use it, only the site coordinates, which we will send.

90 km and 666 m of fall, from 1,800 m in the Buhweju hills to 1,134 m at Lake Victoria. Elevations are the published figures for these places, not a surveyed bed profile.

Where we actually work

Three of the ten districts in the catchment have programmes running. The rest are part of the same watershed and carry none of our work.

  • Buhweju
  • Bushenyi
  • Sheema
  • Ntungamo
  • Mbarara
  • Rwampara
  • Isingiro
  • Kiruhura
  • Lyantonde
  • Rakai and Kyotera
Open the interactive map

The full explorer has the terrain, the 3D model and the downloadable data. It is built for a larger screen.

Why work across a whole basin?

What happens upstream does not stay upstream

A hillside cleared forty kilometres away decides what the water looks like at Mbarara. Four steps, every one of them ordinary, and not one of them stopped by a district boundary.

  1. 01Upstream

    Vegetation is cleared

    Headwater slopes that used to hold forest are farmed or cut for poles. Nothing is rooted where the rain lands first.

  2. 02On the slope

    Soil moves

    With no root structure, heavy rain lifts topsoil off the hillside instead of soaking into it. The farmer loses the field slowly.

  3. 03In the channel

    Sediment arrives

    That soil ends up in the river. The bed rises, the channel widens, and the banks it undercuts were stable before.

  4. 04Downstream

    The water changes

    Turbidity rises, treatment costs more, and the wetlands that would have filtered it have been drained for cultivation.

Each step is documented on the threats page with its source. The chain is why a buffer strip planted at Rwentondo is measured against a control stretch upstream rather than against nothing.

From map to measurement

What we are measuring along the river

Six fixed points, sampled quarterly. One of them is a control stretch we deliberately never restored, because a number with nothing to compare it against is not a result.

All monitoring data
  • RW-04restored

    62NTU

    8 lower than a year ago

    Downstream of our earliest buffer planting.

    2026 Q2 · Rwampara

  • RW-05control

    88NTU

    1 lower than a year ago

    Control stretch — deliberately not restored.

    2026 Q2 · Rwampara

  • RW-02urban

    131NTU

    25 higher than a year ago

    Katete bridge, mid-city.

    2026 Q2 · Mbarara

Turbidity in nephelometric units; lower is better. Last updated 2026-06-30. Flagged as sample data until the organisation's field records are loaded through the admin — the charts carry the same flag rather than hiding it.

Ask and we will send it

Usually within a week. There is no charge and no form to sign beyond telling us what you are doing with it.